  2. Kick-Out Flashing Installation Done Right
Kick-out flashing • Installation detail

Kick-Out Flashing Installation Done Right

Retrofitting a kick-out on an existing stucco wall is a precise job: the stucco has to be cut back cleanly, the flashing tied into the step flashing and weather barrier in the right order, and the finish rebuilt so it does not crack at the new edge.

  • Retrofits on stucco & EIFS
  • Lapped with the barrier
  • Finish rebuilt
  • Multifamily & commercial
Darrin Straub

Request a consultation & estimate

Residential or commercial. We’ll get back to you to set up an evaluation.

We never share your information. Prefer to talk? Call (888) 592-1304.

Installation detail

A kick-out only works if it is lapped correctly

A surprising number of kick-outs we find are installed but still leak. Some were set on top of the stucco and caulked, so water runs behind them. Some sit under the step flashing instead of receiving it. Others have no sealed corner, or are so short that runoff overshoots them in a heavy storm. Correct installation follows one rule: every upper layer laps over the one below it.

On an existing wall that means cutting the stucco or EIFS back far enough to reach the weather barrier, slipping the kick-out under the lowest step flashing and over the gutter edge, then lapping new barrier strips over the kick-out flange. The lath or mesh is restored, the base coat is rebuilt with reinforcement across the joint between old and new, and the finish is matched.

We install kick-outs on single houses and on townhomes, apartments and commercial buildings where many roof-to-wall corners repeat along a facade. On those projects we inspect every corner, retrofit them in a set sequence and repair wet areas found along the way. For homeowners wondering whether they need one, see kickout flashing for homes; for full facades, see protecting existing systems.

Weather barrier and flashing detail behind a stucco wall
Getting the detail right

Four parts of a proper retrofit

Skip any one of these and the kick-out becomes a leak source of its own.

Clean cut-back

Stucco or EIFS removed to a straight line wide enough to reach the barrier and lath behind.

Room to lap layers

Barrier integration

Kick-out set under the lowest step flashing, then new barrier strips lapped over its flange.

Upper over lower

Sized for the roof

A diverter long and tall enough for the roof area draining onto it, with a sealed, leak-tight corner.

Matches the runoff

Finish rebuilt

Base coat reinforced across the old-to-new joint and the finish matched in texture and color.

No crack at the seam
Single home or whole property

How the work changes with building type

On a single house, a kick-out retrofit is usually one or two corners. On multifamily and commercial buildings, roof-to-wall conditions repeat at every unit, breezeway roof or canopy, and the job becomes a program: survey, prioritize by moisture readings, then retrofit corner by corner with residents in place.

EIFS walls need a different cut and repair method from hard coat; the foam is trimmed back and new mesh and base coat are lapped onto the existing system.

Kick-out retrofits by building type
BuildingTypical conditionApproach
Single-family homeOne to a few cornersRetrofit and patch
TownhomesRepeated corners per unitSurvey, then sequence
Apartments & condosBreezeway and canopy roofsPhased with residents
CommercialCanopies, parapet stepsScoped by elevation
EIFS wallsFoam behind the finishEIFS repair method
Installation sequence

How we retrofit a kick-out on existing stucco

The order of the layers is the whole job. This is the sequence we follow at each corner.

Survey & cut back

We probe below the roof corner, mark the repair area and cut the stucco or EIFS back to sound material and exposed barrier.

  • Moisture probed first
  • Straight, clean cut line
  • Wet sheathing removed

Flash & lap

New sheathing goes in where needed, the kick-out is set under the step flashing, and barrier strips are lapped over its flange.

  • Kick-out under step flashing
  • Barrier lapped over flange
  • Corner sealed

Rebuild finish

Lath or mesh is restored, base coat is reinforced across the seam and the finish is matched, then we check runoff into the gutter.

  • Seam reinforced
  • Texture and color matched
  • Runoff checked

Managing a property with many roof-to-wall corners?

We can survey them all and retrofit in a planned sequence.

Request an estimate
Reviews

What our customers say

Homeowners and long-time commercial clients on working with ASR.

“For over 10 years we have relied on ASR for all our stucco repair needs, but as well, for a number of other water intrusion related solutions. Their leadership are responsive and have trained their technicians well.”
Google review
Wilburn House10+ year repeat customer
“A quality honest contractor is hard to come by – I’d use ASR for anything I could.”
Google review
Joe WatsonGoogle review
“Outstanding results and very professional in every aspect during the construction and painting work done. Excellent follow-up by the President to ensure satisfaction during and after the job was completed.”
Jim H.Customer letter

Read more reviews

Questions & answers

Kick-out installation questions

Questions from homeowners, builders and property managers.

Can a kick-out be installed without cutting the stucco?
Not correctly. Surface-mounted kick-outs that are caulked to the finish let water run behind them. The flashing has to lap under the step flashing and the weather barrier, which means opening the wall.
Why does my existing kick-out still leak?
Common reasons are installation on top of the barrier instead of under it, a missing or open corner seal, or a diverter too small for the roof area. We check how it was lapped before recommending a fix.
Is the retrofit different on EIFS?
Yes. EIFS foam is trimmed back and the repair uses EIFS mesh, base coat and finish lapped onto the existing system, rather than lath and cement coats.
Do you retrofit kick-outs on apartment and townhome buildings?
Yes. We survey every roof-to-wall corner, prioritize by moisture readings and retrofit in sequence while residents stay in place.
How is the work quoted?
After an on-site survey we send a written scope per corner or per building. Call (888) 592-1304 or send the form to arrange it.

Plan a kick-out retrofit

From a single porch roof to every corner on a townhome row, we will survey, retrofit and rebuild the finish.

Get started

Request a consultation & estimate

Homeowners and commercial clients alike: tell us about the property and what you are seeing.

Darrin Straub

Send us your project details

Residential or commercial. We’ll get back to you to set up an evaluation.

We never share your information. Prefer to talk? Call (888) 592-1304.