1. Home
  2. Commercial
  3. Drainable EIFS That Lets Water Out
Drainable EIFS • Commercial

Drainable EIFS That Lets Water Out

No exterior wall keeps out every drop. A drainable EIFS assumes some water will get past the surface and gives it a planned route out. We install and retrofit drainable systems on commercial buildings across Georgia.

  • Water-resistive barrier
  • Drainage plane
  • Starter track & weeps
  • Retrofits of barrier EIFS
Darrin Straub

Request a consultation & estimate

Residential or commercial. We’ll get back to you to set up an evaluation.

We never share your information. Prefer to talk? Call (888) 592-1304.

Why drainage

Built for a wet climate

Georgia gets long stretches of humid weather and summer storms that drive rain sideways into a facade. On a commercial building with hundreds of window openings, storefront frames, louvers and roof transitions, it is unrealistic to expect every sealant joint to stay perfect for its whole service life.

Barrier EIFS bet everything on that outer seal. Drainable EIFS adds a second line of defense: a water-resistive barrier over the sheathing, a small gap or channel between that barrier and the foam, and a way for water to exit at the base of the wall and at each floor line. When a joint eventually ages, water that gets behind the foam drains out instead of sitting against the sheathing.

That is why drainable systems are standard on new commercial work and why many owners convert older facades during a re-clad. The concept is simple, but the details at windows, floor lines and the base of the wall are where it succeeds or fails. See our pages on the full EIFS assembly, system upgrades and exterior joint sealants.

Drainage components at the base of an exterior wall
1999Installing EIFS in Georgia
The components

Parts of a drainable system

Each component is small; leaving one out breaks the drainage path for the whole wall.

Water-resistive barrier

A fluid-applied or sheet membrane over treated sheathing joints is the true waterproof line of the wall.

Continuous and lapped

Drainage gap

Vertical adhesive ribbons, grooved board or a drainage mat create space for water to run down behind the foam.

Water moves freely

Starter track

A perforated track at the base supports the system and lets drained water exit to the outside.

Open, never sealed

Drainage at floor lines

On multi-story walls, horizontal joints with flashing release water at each level instead of stacking it.

Water released by floor

Opening flashings

Sill pans and head flashings lapped onto the barrier steer water from windows into the drainage plane.

Lapped shingle-style

Penetration seals

Pipes, lights and anchors are sealed at the barrier line as well as at the finish surface.

Two lines of seal
Barrier vs drainable

What changes when a wall can drain

For a property manager, the practical difference shows up years later. On a barrier wall, an aging joint can mean hidden sheathing damage that is only discovered when it is extensive. On a drainable wall, the same joint is still a maintenance item, but water that gets past it has a way out.

Converting an existing barrier facade means removing the old system, repairing sheathing, installing the barrier and drainage components, and re-flashing every opening. We plan these retrofits by elevation so tenants and customers can keep using the building.

Barrier and drainable EIFS compared
ItemBarrier EIFSDrainable EIFS
Behind the foamAdhesive on sheathingBarrier plus drainage gap
Base of wallFoam edge, wrappedPerforated starter track
Window detailSealant onlySill pan into drainage plane
Aging jointsRisk to sheathingWater drains out
Typical use todayRepairs to old wallsNew work and re-clads
Our process

How we install drainable EIFS

Most of the drainage work happens before the foam goes on, so we inspect it before it is covered.

Prepare the barrier

Sheathing joints and corners are treated, the barrier is applied, and openings are flashed and lapped into it.

  • Sheathing joints treated
  • Barrier applied evenly
  • Sill pans installed

Set the drainage path

Starter track goes in at the base and floor lines, and board is set with vertical adhesive ribbons or a drainage layer.

  • Perforated track level
  • Ribbons run vertical
  • Gaps kept open

Close & verify

Base coat, mesh and finish are applied, sealant joints installed, and weeps checked so the drainage outlets stay clear.

  • Mesh fully embedded
  • Weeps left open
  • Photos of each stage

Planning a re-clad?

Ask us about converting an older barrier facade to a drainable system.

Request a quote
Reviews

What our customers say

Homeowners and long-time commercial clients on working with ASR.

“We had a section of our wall that was crumbling, and I was worried the repairs would stand out. Not only did they fix the issue, but they matched the color and texture so perfectly that I honestly can’t tell where the damage was.”
Google review
Nicolas RoweGoogle review
“Excellent customer service and craftsmanship! I have used Darrin and the team several times and have never been disappointed!”
Google review
LoganGoogle review
“I got quality of work with a quality product; the workmanship of his staff do amazing work. As a woman, I despise mess, I had none with the crew and the phenomenal way they cleaned up.”
Michelle R.Customer letter

Read more reviews

Questions & answers

Drainable EIFS questions

What owners, managers and general contractors ask about drainable systems.

How do I know if my building has drainable EIFS?
Look at the base of the wall for a perforated starter track or weep openings. A barrier system usually ends in a foam edge wrapped with mesh. Construction documents or a small inspection opening can confirm it.
Does drainable EIFS still need sealant joints?
Yes. Sealant at windows, doors and penetrations is still the first line of defense and needs regular renewal. Drainage is the backup that protects the sheathing when a joint ages.
Can an existing barrier EIFS be converted to drainable?
Not by adding parts to the surface; the barrier and drainage path sit behind the foam. Conversion means removing the old system, repairing the sheathing and installing a drainable system, usually one elevation at a time.
Is drainable EIFS required on commercial buildings?
Requirements depend on local code, the building type and the project specification. Drainable systems are the common choice on new commercial work in Georgia, and the design team sets the requirement.
Do you install drainable EIFS on homes?
Yes. Although this page focuses on commercial buildings, we also install drainable EIFS on houses and additions. See our EIFS overview.

Talk to us about a drainable wall

New building or retrofit, send the details or call (888) 592-1304. We will review the conditions and prepare a written quote.

Get started

Request a consultation & estimate

Property managers, owners, HOAs and general contractors: tell us about the building and what you are seeing.

Darrin Straub

Send us your project details

Residential or commercial. We’ll get back to you to set up an evaluation.

We never share your information. Prefer to talk? Call (888) 592-1304.